The significance of monitoring end distribution over three-phase conductors in distributed fault diagnosis of transmission lines

Author: Click:249 Time:2025-01-16

Distribute the monitoring terminal in the three-phase conductor of the overhead transmission line is our Dingsin Intelligent Technology transmission l

Distribute the monitoring terminal in the three-phase conductor of the overhead transmission line is our Dingsin Intelligent Technology transmission line distributed fault diagnosis system monitoring terminal distribution characteristics, and each phase of the conductor each installation of a monitoring terminal, this layout contains a number of important significance for ensuring the safe and stable operation of power lines, the key role in ensuring the safety and stability of operation. This layout contains many important meanings and plays a key role in ensuring the safe and stable operation of transmission lines.

1、Three-phase independent monitoring ;.

The A, B and C phase conductors are mutually independent electrical circuits in the transmission process, and the monitoring terminals installed on each phase of the conductor are capable of independently collecting and analyzing the operating parameters of the line in this phase. When a fault occurs, the fault characteristics of different phases may differ depending on the type of fault (e.g., lightning strike/non-lightning strike, high-resistance/metal ground fault, phase-to-phase short-circuit fault, etc.). By using the monitoring end of each of the three phase conductors, it is possible to ground determine in which phase the fault occurs, thus enabling more fault localization. For example, in a single-phase grounding fault, only the monitoring terminal of the faulty phase will detect typical fault characteristics such as a sudden change in the zero sequence current, and O&M personnel can quickly locate the faulty phase based on this information.



2、Space positioning advantages

Multiple observation points - By installing monitoring ends on all three-phase conductors, fault information can be obtained from different spatial locations, and for some faults that may be caused by differences in spatial location (such as inter-phase short-circuits caused by foreign objects, which may be contacted at different locations on different phase conductors), the data of the three-phase monitoring ends can be synthesized to more accurately Determine the spatial location of the fault point, but also the technical parameters of the transmission line distributed fault diagnostic system of the interval localization reliability of more than 99% of the underlying source.

3. Capturing the difference between different phase faults

Different types of faults in the three-phase conductor will show different electrical characteristics, through the comprehensive analysis of the three-phase monitoring end data, can identify a variety of complex fault types, is an important source of data for fault judgment.

4. Redundant monitoring safeguards

The installation of separate monitoring terminals on each of the three phases of the conductor is equivalent to providing redundant monitoring means. Even if a phase of the monitoring end of the communication failure, sensor damage and other failures, the other two phases of the monitoring end can still work normally, continue to provide part of the data for fault diagnosis, reduce the risk of failure due to a single monitoring end of the failure of the entire fault monitoring system failure.  

5. Data cross-validation ;

Under normal operating conditions, the electrical parameters such as current, voltage and phase of the three phases will satisfy a certain balance relationship. By comparing and analyzing the three-phase data, the accuracy of the data can be verified. When the data is abnormal, through the cross-validation of the three-phase data, it can distinguish whether the data change is caused by the real fault or the error or interference of the monitoring terminal itself, which becomes an important basis for the diagnosis process.



Related recommendations

The online monitoring, distributed fault location and cable online monitoring equipment for power transmission and distribution lines launched by SHENZHEN DINSEE SMART TECHNOLOGY CO.,LTD. has been widely used in Southern Power Grid and State Grid, and has achieved good results.

Record No.: Yue ICP Bei 2022070794-1 | Website Map XML Map

主站蜘蛛池模板: 国产av一区二区精品凹凸| 成熟妇女性成熟满足视频| 免费人成自慰网站| 国产粉嫩高中无套进入| 亚洲 欧美 中文 日韩aⅴ| 久久视频这里只精品10| 久久综合伊人中文字幕| 国产伦孑沙发午休精品| 色窝窝无码一区二区三区色欲| 久久精品无码免费不卡| 国产精品女人呻吟在线观看| 鸭子tv国产在线永久播放| 精品国产三级a在线观看| 亚洲无码网站| 久久久久国产精品熟女影院| 亚洲欧美一区二区成人片| 天天躁日日躁狠狠久久| 久久久久爽爽爽爽一区老女人| 好紧好湿太硬了我太爽了视频| 亚洲欧美黑人深喉猛交群| 97人妻免费公开在线视频| 亚洲中文字幕无码天然素人| 亚洲色欲色欲大片www无码| 欧美丰满老熟妇xxxxx性| 亚洲综合欧美色五月俺也去| 欧美日韩视频无码一区二区三| 强行糟蹋人妻hd中文字幕 | 亚洲欧美丝袜精品久久| 国产亚洲综合视频在线| 国产超碰人人做人人爱| 无遮挡边摸边吃奶边做视频免费 | 在线精品自偷自拍无码中文| 97视频| 高清同性男毛片| 午夜无码伦费影视在线观看| 99久久er热在这里只有精品99| 精品国产人成亚洲区| 日产无码| 免费人妻无码不卡中文视频| 一本久久a久久精品亚洲| 免费网站内射红桃视频|